Download the Solution Brief:
University Campus DAS
Fill out the form to the right to receive a PDF version of our solution brief.
About the University Campus DAS Project:
- Multi-carrier capable DAS in ten buildings with six sectors of outdoor nodes
- System consisted of 72 mid-power remotes; twelve high power remotes; fiber link to the remote head end location; eight sectors of base station equipment
- ANS was the integrator; responsible for updating designs to reflect field conditions, the build-out of the system including sweep and PIM testing, provisioning of the campus-to-head end fiber equipment, integration, and acceptance testing.